Installation Guide for Elevated Floor

Elevated flooring plays an important role in modern building decoration, not only providing a beautiful and elegant appearance, but also providing additional wiring space, improving air circulation, and enhancing the sound insulation effect of rooms. However, installing elevated flooring is not an easy task and requires meticulous preparation and professional conhttps://www.proraisedfloor.com/Raised-Access-Floor-pl48176587.htmlstruction. The following is a comprehensive guide for installing elevated flooring to help you successfully complete the installation task.


1、 Preliminary preparation

Material inspection:

Ensure that the elevated floor and its supporting systems, accessories, and other materials meet the project requirements.

Check the appearance of the floor for defects such as cracks, deformations, etc.

Verify the specifications, models, and quantities of the materials.

Tool preparation:

Electric drill, impact drill, wrench, screwdriver, level, laser level, steel ruler, ink bucket, rubber hammer, floor suction cup, cutting saw, etc.

Conduct a comprehensive inspection and debugging of all equipment to ensure their good performance.

Ground treatment:

Thoroughly clean the ground base layer, using tools such as brooms and vacuum cleaners to remove dust, debris, oil stains, etc. from the surface.

Ensure that the surface of the base layer is clean and dry, laying a solid foundation for subsequent construction.


2、 Installation steps

1. Fixed support system

Mark the position of the support feet: Based on the room plan size and floor laying plan, accurately mark the installation position of the support feet on the ground. The spacing between supporting feet is usually set reasonably according to the floor size and load-bearing requirements.

Install support feet: Use expansion bolts or specialized glue to firmly fix the support feet to the ground. During the installation process, a level should be used to check to ensure that the support feet are vertical and the height error is controlled within ± 0.5mm.

Connecting the crossbeam: Connect the crossbeam to the installed support feet to ensure a tight and secure connection. After connection, it is necessary to use a spirit level again to check the levelness of the crossbeam.


2. Laying the floor

Laying direction: Determine the laying direction of the floor according to design requirements or room layout.

Piece by piece placement: Use floor suction cups to place the elevated floor piece by piece on the crossbeam, paying attention to the splicing method of the floor to ensure tight and flat splicing.

Adjust the flatness: During the laying process, a level should be frequently used to check the flatness of the floor. If unevenness is found, it can be corrected by adjusting the height of the bracket.


3. Edge trimming and detail processing

Edge trimming: Cut the floor or use appropriate edge trimming parts according to the actual size at the wall, door frame, column, etc.

Opening treatment: If the floor needs to be perforated, it must have a complete structure, neat appearance, and no sharp edges or burrs. Decorative treatment is required after opening to ensure safety.

Fixed angle iron: After laying, fix the angle iron around the corners of the wall to ensure that the level of the angle iron is consistent with the level of the installed floor.


3、 Inspection and acceptance

Comprehensive inspection: After installation, conduct a comprehensive inspection of the entire floor surface, including flatness, splicing quality, anti-static performance (if applicable), etc.

Adjustment and correction: If the flatness does not meet the requirements or there are problems with the splicing quality, adjustments and corrections should be made in a timely manner.

Acceptance qualified: After passing the inspection and acceptance, the next construction process, such as installing skirting boards, can be carried out.


4、 Precautions

Safety first: During the construction process, it is essential to comply with safety operating procedures and wear personal protective equipment.

Accurate measurement: When cutting floors or installing accessories, it is essential to perform precise measurements to ensure installation accuracy.

Maintain cleanliness: During the construction process, keep the construction site clean to avoid debris affecting the installation quality.


By carefully following the above steps and strictly adhering to the precautions, you can successfully complete the installation task of the raised floor. I hope this guide can provide valuable reference for your decoration project!


The company has always been adhering to the concept of: customer satisfaction, continuous improvement, and quality assurance

QUICK LINKS

CONTACT US

 Room 20F, Huaren International Building, No 2 Shandong Road, Shinan District, Qingdao City Shandong Province China
 +86-15266259305
 +86-532-88991117
 trade01@jade-light.com
Leave a Message
Keep In Touch With Us
​Copyright © 2023 Qingdao Jadelight International Trading Co., Ltd.